The Shire of Capel plans to install a blister island on Jules Road, just before the Frances Road intersection, heading north.

There are also plans to extend and connect the footpaths along Jules Road, as part of the Shire’s capital works program, enabling community to travel uninterrupted by foot.

A speed limit will be introduced, as Jules Road is currently unzoned (unposted), allowing vehicles to travel to the maximum speed of 110 km/per hour.

In consultation with Main Roads, it has been proposed a speed limit of 70km/per hour be applied based on surrounding infrastructure, vehicle and pedestrian volumes and the latest traffic data.

The Shire of Capel plans to install a blister island on Jules Road, just before the Frances Road intersection, heading north.

There are also plans to extend and connect the footpaths along Jules Road, as part of the Shire’s capital works program, enabling community to travel uninterrupted by foot.

A speed limit will be introduced, as Jules Road is currently unzoned (unposted), allowing vehicles to travel to the maximum speed of 110 km/per hour.

In consultation with Main Roads, it has been proposed a speed limit of 70km/per hour be applied based on surrounding infrastructure, vehicle and pedestrian volumes and the latest traffic data.

  • Social Graphic - Notice of Road Works

    Share Social Graphic - Notice of Road Works on Facebook Share Social Graphic - Notice of Road Works on X (formerly Twitter) Share Social Graphic - Notice of Road Works on Linkedin Email Social Graphic - Notice of Road Works link

  • Works commencing - Monday 13 July 2026

    Share Works commencing - Monday 13 July 2026 on Facebook Share Works commencing - Monday 13 July 2026 on X (formerly Twitter) Share Works commencing - Monday 13 July 2026 on Linkedin Email Works commencing - Monday 13 July 2026 link

    The Shire wishes to advise residents that works will be commencing on Jules Road North MONDAY 13 July 2026, weather permitting.

    Works will commence next week between the Holcim entrance and Frances road with the installation of a blister island and rerouting of the footpath to accommodate. These works will include a road and footpath closure with detours in place, as well as traffic control.

    The second stage is the installation of new footpath to connect the two existing footpaths on Jules Road North. There will also be road closure, detours and traffic management in place for this second stage, with local traffic access permitted for residents within the area affected by the closure.

    The entire projected timeframe for works is currently six weeks, however this is to allow rain affected days. In the event of favourable weather conditions, works are expected to be completed sooner.

    The Shire wishes to advise residents that works will be commencing on Jules Road North MONDAY 13 July 2026, weather permitting.

    Works will commence next week between the Holcim entrance and Frances road with the installation of a blister island and rerouting of the footpath to accommodate. These works will include a road and footpath closure with detours in place, as well as traffic control.

    The second stage is the installation of new footpath to connect the two existing footpaths on Jules Road North. There will also be road closure, detours and traffic management in place for this second stage, with local traffic access permitted for residents within the area affected by the closure.

    The entire projected timeframe for works is currently six weeks, however this is to allow rain affected days. In the event of favourable weather conditions, works are expected to be completed sooner.